Please present a summary of the PJM load forecast for DOM.
The PJM Derived load forecast for the DOM Zone is included as page 36 in the "Modeling Meeting 1 Slides" document posted here:
https://devirp.dominionenergy.com/img/feedback/media/Modeling-Meeting-1-Slides-4.29.26.pdf
.