Please present a summary of the PJM load forecast for DOM.
The PJM Derived load forecast for the DOM Zone is included as page 36 in the "Modeling Meeting 1 Slides" document posted here:
https://devirp.dominionenergy.com/img/feedback/media/Modeling-Meeting-1-Slides-4.29.26.pdf
.
Other Stakeholder Questions and Answers
The SCC's final order on the 2024 states: "In modeling Dominion’s next IRP, Dominion and Staff shall work together to develop a locational model in PLEXOS using no more than four (4) Virginia-specific regional nodes." Was that direction changed during the 2025 update process, or does Dominion plan to add some load nodes to the model?
Are VPPs considered DSM or Energy solutions in the context of IRP modeling?