How does the current IRP account for physical limitations in available infrastructure?

The IRP model includes realistic build limits for new generation to meet demand, which is not location-specific.  The build limits are based on Dominion Energy’s extensive experience developing infrastructure projects within its service territory.  The IRP model also takes into account the current transmission import capabilities of the Dominion Zone and future transmission projects. 